PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing Stairs -4 Facing East (800x600).jpg Installed shear studs throughout the 3rd Floor Facing East (800x600).jpg Installed shear studs throughout the 4th Floor Facing South (800x600).jpg Installed wire mesh and rebar at the 2nd Floor Facing North (800x600).jpg Welded embeds and couplers at around the 3rd Floor Facing West (800x600).jpg
Next page Continued installing Stairs -4 Facing East (800x600)
Continued installing Stairs -4 Facing East (800x600)